problem
Position:Home > problem >

Processing and solarPhotovoltaic solar energy laying cable p

(1) A metal cable pipe should not have perforations, cracks, severe corrosion significantly uneven and so on, the pipe wall should be smooth and without glitches. After the cable pipe bending should not have cracks or significantly dented phenomenon, the degree of bend pipe diameter of not more than 10%, the nozzle should be made of horn or polished.
(2) The cable tube diameter of not less than 1.5 times the cable diameter, bend radius should be consistent with the provisions of penetration of cable bend radius. Each cable should not be more than three pipe elbow. Not more than two right angles.
(3) Connecting cable pipe shall meet the following requirements:
a, metal pipes should adopt large short tube socket level, short tube weld ends sealed with a threaded connection time, the connection sealed.
b, metal pipe at the socket or plug, the insertion depth of not less than 1.1 to 1.8 times the diameter, the docking surfaces should be coated with glue cement seal. When using sockets, casing welding ends should be sealed in order to ensure a secure seal.
c, thin-walled steel welded connection is strictly prohibited.
(4) When the thin-walled steel pipe for the cable should be coated with anti-corrosion paint (inside concrete buried pipe may not be painted); When using galvanized pipes, galvanized layer is peeled position should also be coated with anti-corrosion paint.
(5) Lead to the cable pipe outlet location devices should be easy device connection and without prejudice to dismantling and access. Parallel cable laying pipe mouth should be arranged in neat rows.
(6) The protective tube for the grounding wire when use of the cable, the ground wire should be welded well, then the laying of cables. There are threaded pipe joints, should be soldered jumpers.
(7) Pipe into the box (box) To straight, in box (box) within the exposed length equal to or less than 5 mm, with locking nut of the tube, the tube is exposed thread locknut 2 to 4 buckles .

Preparation and installation of cable tray:
(1) Cable tray and accessories should be properly stored and custody, should not cause deformation and damage, and should be product certification.
(2) Cable trays should be installed firmly, smooth vertical and horizontal, the vertical deviation should not be greater than the length of 2/1000, the level of error should not be larger than the width of 2/1000.
(3) Cable bridge in the live production of non-standard parts and welding, must be painted anticorrosive primer, paint should be uniform and complete color consistency.
Prev:None     Next:None
男生裸睡勃起流出液体| 男人的天堂AV| 少妇无力反抗慢慢张开双腿| 无码亚洲成A∧人片在线播放| 性色AV一区二区三区 | 丰满大肥婆肥奶大屁股| 国产麻传媒精品国产AV| 情欲情欲欲超市全文无删减| 精品国产污污免费网站AⅤ| 久久久久亚洲AV无码专区喷水| 免费a片在线观看| 波多野结衣 电影| 久久久久久久精品免费看A片| 国产成人无码精品久久久免费| 人人澡人人透人人爽| 欧美成人在线视频| 欧美精品视频一区二区三区| 亚洲欧美乱综合图片区小说区| 高H秘书不许穿内裤1V1| 欧美性激烈粗大精品XXX| 精品国产一区二区三区四区| 国产人妻久久精品二区三区特黄| 99国产精品无码| 狠狠色婷婷久久一区二区三区 | 撕开奶罩揉吮奶头玩大胸视频| 偷玩熟睡醉酒体育壮男GV| AV小四郎收藏家| 无码人妻精品一区二区蜜桃在线看| 双腿张开被9个黑人调教| 国产黄色视频| 无码人妻一区二区三区精品视频| 再深点灬舒服灬太大了下载| 亚洲精品无码AV人在线观看国产| A片做爰片仑理片免费看| 新金瓶悔1一5集免费大片| 亚洲国产av精品一区二区蜜芽| 国内少妇偷人精品视频免费| 日韩精品视频| 国产熟女露脸大叫高潮| 久久性爱视频| 成人小说亚洲一区二区三区|